We poured the bond beam concrete along the base of the pool walls and poured concrete for the equipment pad. I won't even act like I know anything about concrete finishing, but I did my best to make it look smooth on the pad. Luckily it will get covered by a structure, so it doesn't matter too much about its appearance.
The skimmer box was installed and next will be all the plumbing going from the pool back to the equipment.
No comments:
Post a Comment